start
end
job
client
ground
special intervention
task
1991
In progress

Ravedis dam; height = 90 m - Design of                   excavation works                        PDF CARD

"CELLINA - MEDUNA" Consortium of Reclamation
Calcari dolomitici
Stabilizing of excavations
A
1999
2002
Sa Stria dam
SA STRIA Scarl
-
-
A
1992
1995
Ponte Chiauci dam - Design and technical advice for the excavation works
TRIGNO Scrl, INTERCANTIERI and FURLANIS COSTRUZIONI GENERALI S.p.A.
Limestones
Stabilizing and retaining works
D, A
1989
1993
Advise in connection with the obligations provided for by the Lombardy Region Law no. 57/66
Lombardy Region
-
-
A
1990
1992
Tirso dam -  Cutoff wall
GRASSETTO  S.p.A.
Fractured volcanic rocks
Injections by prewash
-
1992
-
Laurenzana dam
"Piana di Sibari" Consortium of Reclamation
Phillites
-
-
1992
-
Mojkovac dam (Montenegro)
CEE
Loose soils
Ground improvement to protect the further down wall
-
1990
-
Montedologlio dam in Valdichiana (Arezzo)
Self-governing body for the "Land Development of the Arezzo, Perugia, Siena and Terni provinces" 
Flysch
-
-

Copyright © Rocksoil S.p.A. - advice and technical assistance in the geoengineering field