task |
2007 |
In progress |
Building of the new Lombardy Region Seat |
IMPREGILO S.p.A. |
Sands and graviers |
Slab foundation on soil improved by jet-grouting |
D |
2006 |
2007 |
Foundation for the Padua East road junction. |
CIMOLAI |
- |
- |
A |
2001 |
2001 |
CISA motorway - Roccaprebalza and Campedello viaducts |
AUTOCAMIONALE della CISA |
Complesso Ofiolitico della media Val Taro |
Shaft foundations using jet-grouting and micropiles |
A |
1989 |
1994 |
Bulding of the Milan Police Headquarters - New underground spaces |
2 ERRE Consortium |
Sand |
Underpinnings by jet-grouting; retaining works of deep excavations by jet-grouting |
D |
1988 |
1991 |
Vittorio Veneto - Pian di Vedoia motorway - Restello viaduct |
VITTORIO VENETO Consortium |
Landslide debris |
30 m deep shaft foundations, piles and ground improvements |
D |
1988 |
1991 |
Vittorio Veneto - Pian di Vedoia motorway - Lots 2 and 6 |
VITTORIO VENETO Consortium |
Landslide debris |
- |
D |
1992 |
- |
Segno viaduct |
VADO Scarl |
Limi e argille |
Direct Foundation on soil improved by con jet-grouting |
- |
1992 |
- |
Ferrovie Nord Milan-Saronno line - Doubling of the Cadorna-Bovisa section - Protection of the excavation next to buildings |
FI.FE.NORD |
Silty and gravelly sands |
J.G. |
- |
1991 |
- |
"Paullese" State Road no. 415 |
ROMAGNOLI S.p.A. |
Silty sands |
Direct Foundation on soil improved by con jet-grouting |
- |
1991 |
- |
State Road no. 248 "Montebelluna" |
INCISA |
Gravels |
- |
- |
1991 |
- |
Modernisation of the aligment of the "Val Brembana" State Road no. 470 - Stabilisation and foundation works |
A.N.A.S. |
"Esino" Limestone |
- |
- |
1991 |
- |
State Roads no. 308 and 523 of "Val Taro", modernisation of the aligment - slope stabilisation works and foundations |
A.N.A.S. |
- |
- |
- |
1991 |
- |
State Road no. 76 of "Val d'Esino" (Ancona) - Modernisation of the aligment - Slope stabilisation works and foundations |
A.N.A.S. |
- |
- |
- |
1991 |
- |
Improvement of the Tagliamento River banks |
FURLANIS COSTRUZIONI GENERALI S.p.A. |
Silts |
Thin cut-off walls by jet-grouting |
- |
1991 |
- |
State Roads no. 639 and 36 of "Monte Barro" - Civate viaduct |
DUMEZ - DEPURIMPIANTI |
Peats, silts, rocks |
Compensated shaft fondations; J.G.; rock anchored piles |
- |
1990 |
- |
Depurification plant at Termeno |
ITALSTRADE S.p.A. |
Soft and peaty silts under water-table |
Foundation piles (in compression and in traction) |
- |
1990 |
- |
Santa Chiara bridge above the Tirso River |
GRASSETTO S.p.A. |
Fractured volcanic rocks, debris |
Shaft foundations |
- |
1990 |
- |
Foundations and embankments for the Suzzara-Ferrara railway line |
FESCOF Scrl |
Silts, clays and peats |
Foundation piles; J.G.; embankments stabilised with lime or cement; vertical drains |
- |
1989 |
- |
Underground car parks at Revis (Cortina d'Ampezzo) |
PIZZAROTTI S.p.A. |
Landslide debris |
Diaphragms, drainages |
- |
1988 |
- |
Mont Blanc Tunnel - Embankment under the large square in front of the portal |
- |
- |
Stabilisation and improvement works |
- |
1988 |
- |
Prefabbrication systems for rail superstructure with plates, for lining of artificial or natural road tunnel, for structural embankments |
- |
- |
Stabilisation and improvement works |
- |
1988 |
- |
Aquila-Teramo motorway - Collecastino and Chiovano viaducts |
COLLEDARA scrl |
Talus material - Clays |
Foundation piles; J.G. |
- |
1987 |
- |
A1 motorway - Fiano - S.Cesareo section |
GAMBOGI S.p.A. |
Clays and peats |
Vertical drains - Piles |
- |
1987 |
- |
Merano-Bolzano motorway |
PIZZAROTTI S.p.A. |
Alluvium |
Piles, J.G. |
- |
1987 |
- |
A1 motorway - Fiano - S. Cesareo section |
SICALF S.p.A. |
Pyroclastites |
Ground improvements |
|
1987 |
- |
Design of by-pass road and car parks under the Arno River and the boulevards in Florence |
FIRENZE FUTURA Consortium |
- |
- |
P |
1986 |
- |
Treviso-Portogruaro railway line |
ORSINI |
Silts |
|
|
1985 |
- |
Foundations of the railway bridge above the PO River at Cremona |
PIVATO |
- |
Impiego di iniezioni ad altissima pressione "sistema jet-grouting" |
- |
1985 |
- |
Sondrio - Milan Railway line - Bridge above the Adda River - Abutment and pier foundations in the river bed |
CLEIFER Consortium |
Alluvium, sandy silt |
J.G. |
- |
1985 |
- |
Buildings for earthquake victims at Melito (Naples) |
CO.RI. Consortium |
- |
- |
- |
1985 |
- |
Buildings for earthquake victims at Pozzuoli (Naples) |
- |
- |
- |
- |
1984 |
- |
Railway yard at Cervignano del Friuli |
PIZZAROTTI S.p.A. |
Silts and clays |
Piles, J.G. |
- |
1984 |
- |
Foundations of State Railway Shops at Nola |
PIZZAROTTI S.p.A. |
Remolded pyiroclastites |
Piles |
- |
1984 |
- |
Varese by-pass road (East branch), section 2 |
ITALVIE S.p.A. |
Alluvium |
Shaft foundations in river bed carried-out by jet-grouting |
- |
1984 |
- |
Carnia-Pontebba railway line - Fella Bridge |
CARNIA Consortium |
Alluvium |
Shaft foundations in river bed carried-out by jet-grouting |
- |
1984 |
- |
Prison of Parma |
PIZZAROTTI S.p.A. |
Clay |
Pali |
- |
1984 |
- |
"Monte del Vesuvio" railway line |
MOVEFER Consortium |
Pyroclastites, clays and peats |
Piles; J.G.; vertical drains |
- |
1983 |
- |
State Road no. 3 "Flaminia" - Lots I and II |
SICALF |
- |
J.G. |
- |
1982 |
- |
Reconstruction of the railway bridge above the Taro River near Parma |
State Railway |
Graviers |
J.G. |
- |
1981 |
- |
Udine - Carnia - Tarvisio motorway |
ITALSTRADE S.p.A. |
Alluvium |
Foundation shafts by jet-grouting |
- |
1979 |
- |
El Gourzi - El Khroub e Ramdane - Costantine railway line (Algeria) |
ITALSTRADE-COGEFAR Consortium |
- |
- |
- |
1979 |
- |
Frèjus link road ; Bardonecchia - Savolux section |
COGEFAR S.p.A. |
Debris |
Direct Foundations on jet-grouted ground. Foundation shaft by jet-grouting |
- |