start |
end |
job |
client |
ground |
overburden [m] |
span [m] |
length [m] |
special interventions |
type of task |
2006 |
In progress |
Thessaloniki metro (GREECE) |
AEGEK/IMPREGILO/SELI/ANSALDO |
Silty clays, sandy clays, gravelly clays |
30 |
6,2 |
2x8500 |
EPB |
F, D |
2006 |
In progress |
Milan metro - Line 3 - Affori-Comasina extension - Running tunnels and Comasina station |
Europea 92 |
Sands and gravels |
15 |
9,0 |
1500 |
JG, IN |
D |
2005 |
In progress |
Genoa metro - Line 1 - Deferrari-Brignole extension |
METROGENOVA |
Marls and marly limestones under water-table |
10 |
|
|
- |
D |
2001 |
In progress |
Naples metro - Line 6 - Running tunnels and stations |
ANSALDO |
Tufs and pozzolanas |
15 |
8,5 |
3000 |
- |
F |
2001 |
In progress |
Naples metro - Line 1 - Running tunnels and stations |
Metropolitana Milanese S.p.A. |
Tufs and pozzolanas |
30 |
6,75 |
2x4500 |
- |
D |
2001 |
In progress |
Naples metro - Line 1 - Running tunnels |
IMPREGILO e DELLA MORTE |
- |
- |
6,75 |
2x3700 |
EPB |
D |
2002 |
2005 |
metro di Milano - Linea 3 - Tratta Maciachini - Dergano |
CMC e TORNO |
Sands and gravels |
15 |
9 |
967 |
IN |
D |
2002 |
2005 |
Milan metro - Line 3 - Dergano station |
CMC e TORNO |
Sands and gravels |
15 |
16 |
112 |
IN |
D |
1997 |
2005 |
Naples metro - Linea 1 - Dante-Garibaldi extension |
Metropolitana Milanese S.p.A. |
Tufs and pozzolanas |
30 |
6,75 |
2x3700 |
EPB |
F, D |
2002 |
2004 |
Milan metro - Line 4 - Five stations |
Metropolitana Milanese S.p.A. |
Sands and gravels |
cielo aperto |
16 |
750 |
- |
F |
2001 |
2003 |
Athens metro - Line 3 - West extension |
Consorzio AEGEK-AKTOR-SELI |
Clayey sands and sandy clays with conglomerate levels, Athens schists |
15 |
9,44 |
3679 |
EPB |
A |
1999 |
2003 |
Rome metro - Line B1 - Annibaliano shaft and test adit |
Comune di Roma |
Alluvium |
- |
- |
- |
- |
F |
1997 |
2003 |
Rome metro - Line B1 |
Comune di Roma |
Alluvium (clays, silts and sands) |
33 |
6,7 |
6800 |
EPB |
F |
1997 |
2003 |
Rome metro - Line B1 - Nomentana station |
Comune di Roma |
Travertin sands and sandy silts |
20 |
26 |
150 |
AC |
F |
1997 |
2003 |
Rome metro - Line B1 - Annibaliano station |
Comune di Roma |
Recent alluvium, "Siciliano" Formation |
20 |
26 |
150 |
CG, IN, VA |
F |
1997 |
2003 |
Rome metro - Line B1 - Gondar station |
Comune di Roma |
Clayey silts |
20 |
26 |
150 |
CG, IN, VA |
F |
1997 |
2003 |
Rome metro - Line B1 - Conca d'Oro station |
Comune di Roma |
Clayey silts |
20 |
26 |
150 |
- |
F |
2002 |
2002 |
Genoa metro - Line 1 - Grazie-Deferrari extension |
METROGENOVA |
Marls and marly limestones under water-table |
15-20 |
6,25 |
2x500 |
IN+VTR |
F, D |
2001 |
2002 |
Milan metro - Line 3 - Affori station |
Metropolitana Milanese S.p.A. |
Sands and gravels |
- |
16 |
- |
- |
D |
2001 |
2001 |
Genoa metro - Line 1 - Le Grazie-Brignole |
ANSALDO |
Marls and marly limestones under water-table |
10 |
6,25 |
2x800 |
- |
F |
2001 |
2001 |
Genoa metro - Line 1 - Corvetto station |
ANSALDO |
Marls and marly limestones under water-table |
15 |
17 |
80 |
- |
F |
1999 |
2001 |
Milan metro - Line 2 - Famagosta - Abbiategrasso extension |
GRANDI LAVORI FINCOSIT |
Sands and gravels |
12 |
12 |
2x1400 |
CG, IN, EPB |
D |
1998 |
2001 |
Milan underground railway link - Porta Vittoria station |
TORNO S.p.A. |
Sands and gravels |
- |
8,80 ÷ 10,0 |
- |
- |
D |
1988 |
2001 |
Genoa metro - Line 1 - Principe-Le Grazie extension |
ANSALDO Trasporti Metropolitane Scarl |
Marls and marly limestones under water-table |
ott-15 |
6,1 |
2x1800 |
IN + VTR+EPB |
F, D |
1999 |
2000 |
Milan metro - Line 3 - Dergano station |
Metropolitana Milanese S.p.A. |
Sands and gravels |
15 |
16 |
112 |
in |
F |
1988 |
1997 |
Rome metro - Line A - "Baldo degli Ubaldi" station |
Intermetro S.p.A. |
Clayey and sandy-silty formations |
22 |
22 |
120 |
PT, VTR, VA |
D |
1985 |
1993 |
Milan underground railway link - Lot 2PB - Porta Venezia station |
MM Strutture ed Infrastrutture del Territorio S.p.A. |
Alluvium in silty-sandy matrix |
4 |
30 |
220 |
AC |
D |
1992 |
1992 |
Canton metro (China) - Line 1 - Running tunnel and station |
- |
- |
- |
- |
- |
SCU |
A |
1999 |
- |
Milan underground railway link - Lot 7P2 |
Metropolitana Milanese S.p.A. |
Sands and gravels |
8 |
8,80 e 10,0 |
600 |
J.G., IN |
- |
1991 |
- |
Milan underground railway link - Lots 2PA and 4PA2 |
MM Strutture ed Infrastrutture del Territorio S.p.A. |
Loose ground partially under water-table |
- |
- |
- |
IN |
- |
1991 |
- |
Milan underground railway link - Lots 3P, 5P, 6P - Running tunnels |
MM Strutture ed Infrastrutture del Territorio S.p.A. |
Loose ground partially under water-table |
20 |
10 |
520 |
EPB + IN |
|
1991 |
- |
Milan underground railway link - Garibaldi station |
MM Strutture ed Infrastrutture del Territorio S.p.A. |
Loose ground partially under water-table |
20 |
23 |
- |
IN |
- |
1991 |
- |
Naples station - Line 1 - Dante-Vanvitelli and Donzelli-Colli Aminei extensions |
Comune di Napoli |
Tufs and pozzolanas |
30 |
6,55 |
431 |
- |
F, D |
1991 |
- |
Naples metro - Line 1 - Lot 3 - Running tunnel |
Comune di Napoli |
Tufs and pozzolanas |
- |
- |
- |
SCU |
- |
1990 |
- |
Milan metro - Line 3 - Lot 3 - East by-pass underpass at Rogoredo |
MM Strutture ed Infrastrutture del Territorio S.p.A. |
Loose ground |
7 |
10 |
70 |
IN |
- |
1989 |
- |
Brescia metro |
A.S.M. |
Sand and gravel alluvium |
20 |
5 |
500 |
JGV |
- |
1989 |
- |
Marseille metro (France) - Line 1 - Lot 5 |
S.M.M. |
Silty clay |
15 |
10 |
20 |
IN + VTR |
- |
|
- |
| Bologna metro - Lines 1 and 2 |
|
Sisplan S.p.A. |
|
|
8 |
500 |
|
- |
1988 |
- |
Rome metro - Line A - "Aurelia Cornelia" station |
Intermetro S.p.A. |
Clayey and sandy-silty formations |
22 |
22 |
- |
- |
- |
1988 |
- |
Rome metro - Line A - Ottaviano-Battistini extension |
Intermetro S.p.A. |
Clayey and sandy-silty formations |
22 |
6 |
3500 |
- |
- |
1986 |
- |
Naples metro - Rapid Transit System |
MM Strutture ed Infrastrutture del Territorio S.p.A. |
Tufs and pozzolanas |
- |
- |
- |
IN |
- |
1986 |
- |
Milan underground railway link - Lot 1PA |
MM Strutture ed Infrastrutture del Territorio S.p.A. |
Loose ground partially under water-table |
13 |
10 |
430 |
IN |
- |
1985 |
- |
Milan metro - Line 3 - Lot 2B |
Cons. Lodigiani-Grassetto-Romagnoli-Tettamanti |
Alluvium |
- |
- |
- |
IN |
- |
1985 |
- |
Milan metro - Line 3 - Lot 7 - Viale Sondrio |
MM Strutture ed Infrastrutture del Territorio S.p.A |
Alluvium |
- |
- |
- |
- |
- |
1983 |
- |
Singapore metro - Lot 106 |
Metro Singapore |
Clays |
- |
- |
- |
- |
- |
1982 |
- |
Lyon metro (France) |
Metrolione |
Alluvium |
- |
- |
- |
- |
-, |
1980 |
- |
Athens metro - Lot Attiki-Sepolia |
- |
- |
- |
- |
- |
- |
- |