|
| |
|
Reinforcement of the core-face of the Tartaiguille Tunnel (TGV Mediterranée-France)
|
|
One of the caverns of the nuclear physics laboratory under the Gran Sasso |
|
Part of the face of the Tartaiguille Tunnel treated with fibre glass reinforcement |
|
Treatment of the core-face of the San Vitale Tunnel with fibre glass reinforcement (Caserta-Foggia railway line) |
|
|

|
|
|
|
|
|
DESIGN
FEASIBILITY
FINAL
CONSTRUCTION DETAIL |
|
|
|
CONSULTING
TECHNICAL ASSISTANCE ON SITE
MONITORING
CONSTRUCTION MANAGEMENT
|
|
|
|
|
|
|
|
|
UNDERGROUND WORKS
ROAD
RAIL
WATER
METRO RAIL |
FOUNDATIONS AND RETAINING WORKS
BUILDINGS
BRIDGES
VIADUCTS
DAMS
EMBANKMENTS AND TRENCHES
MARITIME AND RIVER WORKS |
ENVIRONMENTAL RECOVERY AND REPAIR
STABILISATION OF SLOPES AND EXCAVATION FACES
ENVIRONMENTAL REPAIR
|
|
|
 |
|
Type of services |
Planning of geological surveys (bore holes, laboratory and in situ tests)
Study of existing natural equilibriums
Analysis of possible solutions with respect for natural equilibriums
Choice of best design from the technical, environmental, financial and long and short term safety viewpoints
Optimisation of project design, complete with forecasts of stress-strain behaviour during construction and service and forecasts of construction times and costs (max. forecast error of ~ ± 10% of final cost)
Design of monitoring systems during construction and service
Technical assistance during construction including monitoring and control of differences between actual and predicted stress-strain behaviour.
|
|
Placing of steel ribs in the Pianoro Tunnel (High Speed/High Capacity railway line between Bologna and Florence)
|
|