The project of the Cityringen consists of two tunnels of 17.4 km kilometers in length and 17 new stations.

Client
Metroselskabet I/S
Location
Copenhagen, Denmark
Status
In progress
Services
Final and Detailed Design for:
structural and geotechnical design of the running tunnels ( 2 x 17.4 km)  and 5 stations: Tømmergraven – Buv, Østerport – Kk, Poul Henningsens Plads – Php, Nørrebros Runddel – Nør, Gammel Strand – Gls
Risk Management Register for tunnels;
Building Risk Assessment along the entire line;
TBM Lining Structural and geotechnical design;
Monitoring activities Plan;
On site assistance services;
Technical Information
Running tunnels:
Total Length: 17,2 km
Diameter: 5.5 m
Stations : 17
Approximate depth: 30m
Cost
€ 1,500,000,000

The Cityringen project will form a new circular line in the city centre and will consist of two 17.4km tunnels and 17 new stations (two of which are transfer stations) all at 30 metres below ground level. From a technical point of view the project is extremely complex, since the city is at sea level. Tunnel excavation is by TBM. A cut and cover service tunnel is also foreseen for the connection to the operation and maintenance centre.

The fully automated driverless metro system will operate 24 hours a day, with a minimum frequency of 100 seconds, guaranteeing efficient mobility for 130 million metro passengers a year.

For Copenhagen this new metro line will mean a rapid, safe and environmentally sensible means of transportation.