Go to Top

Design

We design civil engineering structure and infrastructure. We love underground.

Consulting

We offer to our customers all our experience.We solve any complex engineering problem.

Technical Assistance

We follow all the phases of the work with our best technicians, equipped with great experience.

Monitoring

We monitor all the construction phases of a work, with attention and precision, using innovative techniques.

ENGINEERING NEWS RECORD

Winners, with Pietro Lunardi , the title " MAN OF THE YEAR IN CONSTRUCTION FIELD"
for the innovative 'cellullare arc method' which allowed to realize the Porta Venezia Station of Milan (Italy).

With the increasing demands of traffic, it is more and more frequently necessary to widen roads motorways and rail tracks to increase their capacity. The problem becomes difficult if not impossible when the routes run through tunnels unless resort is made to costly additional routes with the creation of new tunnel arches to add to the existing ones.

Rocksoil S.p.A. has researched and developed special new technology which by making judicious use of the "active arch" principle and modern conservation systems, allows routes to be widened and all works to be carried out while traffic runs in safety under a protective "steel shell".

This technology was employed to widen the "Nazzano" tunnel, on the Rome to Naples motorway, from two to four lanes in each direction. Particular features include its extreme versatility, since it can be employed in a great variety of ground and stress-strain conditions and the high degree of mechanisation of works that can be achieved with a consequent regular rhythm of tunnel advance and reduction in construction times, all factors with positive repercussions on site budgets and advance rates.

Following the success in Nazzano, the new technology is now applying for enlargement in the presence of traffic of the ''Montedomini'' tunnel (Motorway A14, near Senigallia). 

 

OUR TEAM

To the Rocksoil's team belong the best engineers, geologists, architects and CAD specialists.

Giuseppe Lunardi

C.E.O.

Linkedin

Giovanna Cassani

Technical Director

Linkedin

Martino Gatti

Project Manager

Linkedin

Andrea Bellocchio

Project Manager

Linkedin

Fiorenza Pennino

Head of the Geological Service

Linkedin

Alvise Amadi

Project Manager

Linkedin

Renzo Bindi

Head of Scientific Development  and External Relations

Linkedin

ROCKSOIL AT WORLD TUNNEL CONGRESS 2015

The World Tunnel Congress 2015 (WTC), was opened by Pietro Lunardi,  Rocksoil's founder, with the Muir Wood Lecture.
The title of the lecture was "Control of extrusion in the core of ground at the face as an instrument for the stabilization of the cavity".

OUR LAST WORKS

Einstein Telescope - INFN

Feasibility Study of Einstein Telescope

Orte-Falconara Railway line

Design of Orte-Falconara Railway line 

New Palermo - Catania connection

Design of Lot 1+2: Section Fiumetorto-Lercara 

High Speed - High Capacity railway

Design of New Railway line Salerno-Reggio Calabria

Trento Railway Line Bypass

Design of Trento Rail Bypass - Lot 3A

New railway line Ferrandina-Matera

Design - Railway Line "La Martella" 

BBT Basis Brenner Tunnel - Fortezza

Design of the Isarco River Underpass

Sibiu-Pitesti Highway

Design of Sibiu-Pitesti Highway 

Pedemontana Lombarda Highway

Design - Pedemontana Lombarda: Lot 2B & C 

TELT: La Praz & Saint Martin de la Porte

Design of TELT: Lot 2 - La Praz and Saint-Martin-de-la-Porte 

New Palermo – Messina-Catania Rail

Design - Functional Lot2: Taormina-Giampilieri 

High Speed / High Capacity Napoli-Bari

Design of Napoli-Bari: Orsara-Bovino 

TELT: Lot CO4A- Interchange

Design of Telt - Interchange niches “Maddalena Tunnel” 

High Speed / High Capacity Napoli-Bari

Design - Functional Lot I: Apice - Hirpinia

High Speed / High Capacity Napoli-Bari

Executive design of civil works for Naples-Bari

OUR CLIENTS