Go to Top

Design of tunnels for the construction of the new Warsaw Metro Line 2 in Poland.

Client
Polish Metro Warszawskie
Contractor
AGP METRO POLSKA CONSORTIUM
Location
Poland, Warsaw
Status
2014
Services
Final and Detailed Design, Running  Tunnel 2 X 4.5 km
On site assistance services
Technical Information
Running tunnels: twin tubes
Length: 6 .00 km
Diameter:6.30 m
Overburden: 7 ÷ 22 m
Cost
€ 800,000,000

Warsaw Metro Line 2 will be a 19km-long route with 19 stations running in the east-west direction. It will start from Chrzanów station and end at Rembielińska. It will have  intermediate stations at Lazurowa, Powstańców Śląskich, Człuchowska, Wolska, Bema, Płocka, Daszyńskiego Traffic Circle, ONZ Traffic Circle, Marszałkowska, Nowy Świat, PowiŚle, Praga Centrum, Dworzec Wileński, Szwedzka, Targówek, Zacisze and Kondratowicza.

Stage 1 involves construction of a 6km-long underground railway tunnel from Rondo Daszynskiego in the city centre to Dworzec Wilenski in the north-eastern suburbs beneath the Vistula River. It will have stations at Daszyńskiego Traffic Circle, ONZ Traffic Circle, Marszałkowska, Nowy Świat, PowiŚle, Praga Centrum and Dworzec Wileński.